Uncategorized
System Design
- If approved by the SSC, proposers of a system design will be funded to proceed to this phase.
- Develop system design requirements
- Assess and develop system designs for the most challenging aspects of the instrument
- Hold a friendly review of the science and technical cases
- Work with WMKO staff to establish requirements for the location, interfaces, operations, long-term maintenance, and establish the process for the instrument development steps including the review needs.
- Refine the science case as needed.
- End products:
- Refined science cases
- System designs for the instrument that are advanced from the conceptual designs
- Documentation that shows that technical risks have been identified and an approach to reduce risk is planned.
- Preliminary Budget and schedule for the full scale development through commissioning and ready for external review.
- Work break down structure and preliminary management plan.
- A presentation to the SSC and request to move to the proposal phase.